Out on the North Sea over night next stop Brunsbüttel.

Onsdag 18:06 05:36 Onsdag 18-06 05:38 IMG_5322 IMG_5323

IMG_535718:06 Brunsbüttel

First reef in mainsail, heavy waves and a lot of wind we went for sail to Brunsbüttel in the Kiel canal. Frederik made a nice spaghetti bolognese testing out the support band in the galley. We went into the dock with the cargo ships because the smaller dock was closed. In the harbor we put lid on the 2 fresh water and 2 black water tanks. After that we deserved a meal at the restaurant on the harbor.

First leg Harlingen Monday 15 June

Before leaving Hindeloope a new start-battery was bought at the harbor boat shop and installed. Lars did not trust the old one. Then left after filling up with diesel not knowing that the port tank was filled up and the switch on hand driven. I had to test steering with the rat and so had Frederik and Kristoffer also. In Harlingen we could ad a lot of good dutch food to the fridge and freezer.

IMG_0184 IMG_0183 IMG_5317

 

Sailing Alexandra home to Denmark

IMG_5268 IMG_5269 IMG_5270Finally we were back in Hindeloope and on board Alexandra in the evening Friday the 13 of June 2014. The tanks were not closed but had to be open until next Wednesday. We had to clean up a little and of cause a lot of that later on at home. Hans and Mariet arrived on Saturday and Hans helped Lars, Frederik (29) and Kristoffer (26) with the rigging of the mainsail. We tested the gas grill in the evening and had a nice supper together.

The tank renovation project

We have got the first pictures from the tank renovation project at Aluboot in HIndeloopen. We are happy that we are doing this now when we see the pictures. One of the septictanks are really corroded. The project will unfortunately be delayed due to the extent of the corrosion

WE look forward to get Alexandra to Denmark when the job is done.

Alexandra-16

more pictures

Alexandra in Hindeloopen

Alexandra is back in Hindeloopen after 25 year. She was build at the shipyard Aluboot in Hindeloopen and launched in 1989. On the 6th of May Alexandra will be put on the hard for repair of the Freshwater tanks and the black-water tanks.

On the 6th of June she will be ready for The final leg back to Denmark.